Direct digital control systems
The Illustrated Guide to Mechanical Building Services, Third Edition (BG 31/2017), by David Bleicher, published by BSRIA in 2017, defines direct digital control systems (DDC) as: ‘…microprocessor-based with analogue inputs from sensors that are digitised. Some manufacturers make a distinction between DDC intended for primary plant control, such as for boilers, and those intended for secondary or terminal unit control such as fan coil units. Primary DDC units are freely programmable with control software configured for a particular method of plant control. DDC units intended specifically for terminal units usually have specific application software built in and only relatively minor configuration settings may need to be adjusted.’
Networked DDC systems: '...consist of two or more DDC controllers that are connected together enabling the exchange of information. Each controller usually controls one particular plant group and can operate autonomously in the event of communications loss. Typical examples of information exchanged between controllers are shared sensor readings, common plant start signals, and interlock signals between different plant groups. If a networked DDC system includes one or more permanent operator terminals it is classified as a building management system (BMS).'
--BSRIA
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.